| |
|
Industrial Plants
Dunham-Bush Manufacturing Co. (Harrisonburg,
Va.)
General Electric (Lynchburg, Va.)
Georgia Pacific Corporation (Big Island,
Va.)
J.M.
Huber Plant (Halifax County, Va.)
Lane Company (Altavista, Va.)
Quality Foods (Lynchburg, Va.)
Robinson Creek Coal (Virgie, Ky.)
Thomasville Industries (Appomattox, Va.)
U.S. Steel (Gary, W. Va.)
Power Plants
Doswell (Doswell, Va.)
Hadson (Altavista, Va.)
Hyco (Hyco, Va.)
Lake Anna (Louisa
Country, Va.)
Mayo Creek (Person
Country, NC)
Mount Storm (Mount
Storm, W. Va)
Roxboro (Roxboro, NC)
Snowden (City of Bedford,
Va.) |
|
Hadson Power Cogeneration Plant
Altavista, Va.

English Construction was awarded the site
work, which consisted of clearing and grubbing, erosion control,
cut and fill required for the structures and buildings (including
the coal yard); undercut and fill for the access road; grading
for roadways and parking areas; site utilities, including fire
protection, sanitary/storm sewers, holding ponds for cooling water
and coal yard runoff. English also performed shoring and excavation
for the raw water intake pump station, installation of the intake
and discharge piping, the coal stacker, and the coal unloading
facility. English was contracted to install the concrete foundations
for the chip storage silo, coal unloading facility, stacker and
conveyor, as well as the foundations or the steam and wood chip
pipelines.
|
|