Neuse River Waste Water Treatment Plant – Raleigh, NC – COMPLETED!

Contract No. 1: General Construction, includes the addition of two (2) blowers with associated piping, valves, modifications to the existing SCADA system, electrical power and control system conduit, conductors and apputenances.