Work consists of constructing approximately 2000ft. of underground ductbanks, upgrading and installing electrical and HVAC equipment at the plant’s lab, admin, personnel, solids handling, blower and sludge pump buildings. Additional work includes electrical upgrades at the UV and Power House building and general upgrades in the lighting at the site and in several of the buildings. Contractor will be responsible for the installation of a new 1750KW generator and associated switchgear.
Owner- Town of Altavista
Architect- Peed & Bortz, LLC.
Original Contract Value- $3,952,000