Curry/Frazer Dorm Renovation-Longwood University- Farmville, VA – In Progress

[vc_row][vc_column][ultimate_heading source=”post_title” margin_design_tab_text=””][/ultimate_heading][vc_column_text css=””]Complete Renovation of Curry and Frazer Residence Halls: a pair of ten-story high rise buildings totaling 217,678 square feet. The work will involve: selective demolition; interior and exterior renovations and new construction; site and utility infrastructure improvements; new fixtures, furnishings, and equipment; and other associated project work. The site work will include…

I-77 Renovation and Additions – Charlotte, NC – In Progress

[vc_row][vc_column][ultimate_heading source=”post_title” margin_design_tab_text=””][/ultimate_heading][vc_column_text css=””]The I-77 HOT Lanes are 26 miles of dedicated toll lanes that will operate adjacent to the current general purpose lanes from I-77/ I-277 in Charlotte to Exit 36 in Mooresville.  English is part of the Design Build Joint Venture team, whose scope includes all design for all roadway and structure components,…

Carvins Cove Water Treatment Facility Upgrade- Roanoke, VA – In Progress

[vc_row][vc_column][ultimate_heading source=”post_title” margin_design_tab_text=””][/ultimate_heading][vc_column_text css=””]Project Name: Carvins Cove WTF – 2018 Filter Upgrade Project Owner: Western Virginia Water Authority Engineer: CHA Consulting, Inc. Project Duration: 270 Calendar Days Project Budget: $2,335,250.00 Project Description: The Project consists of the replacement of filter underdrain laterals, dual media, and wash water troughs; removal and disposal of the existing filter surface wash system, including piping…

Triangle WWTP- Aeration Improvements- County of Durham, NC – In Progress

[vc_row][vc_column][ultimate_heading source=”post_title” margin_design_tab_text=””][/ultimate_heading][vc_column_text css=””]Addition of diffused aeration equipment and two aeration blowers.  Replacement of existing submersible mixing and pumping equipment.  Basin clean out to remove and dispose of all wastewater, solids, and debris. Install Electrical, Instrumentation, and Controls for new Process Equipment.[/vc_column_text][/vc_column][/vc_row]