Contract No. 1: General Construction, includes the addition of two (2) blowers with associated piping, valves, modifications to the existing SCADA system, electrical power and control system conduit, conductors and apputenances.
Filter by Project Type
All
Buildings
Utilities
-
Neuse River Waste Water Treatment Plant - Raleigh, NC - COMPLETED!Neuse River Waste Water Treatment Plant - Raleigh, NC -...
-
Meherrin River Regional Jail - Meherrin, VA - COMPLETED!Meherrin River Regional Jail - Meherrin, VA - COMPLETED!The Meherrin River Regional Jail Alberta Facility is a 400-bed jail with 169,000 square feet located in Alberta, Va. This facility is the main location for the Meherrin River Jail Authority. It is a pre-manufactured steel building with masonry veneer on the front face of the building. The housing area is double-stacked manufactured steel cells. In addition, the housing unit is connected to the administration building where the medical facilities,...
-
Walk 2 Campus 2 Apartment Buildings - Conway, SC - COMPLETED!Walk 2 Campus 2 Apartment Buildings - Conway, SC -...This project consisted of constructing 39, 2-bedroom, 2-bath, multi-story apartments, a leasing office, an asphalt parking lot, and associated sidewalk, curb and gutter. All units included data and cable TV outlets, both a washer and dryer, stove, refrigerator, microwave, laminate wood flooring, and fire protection.