Highlights

  • Completed: September 2012
  • Two New 45,000LB, 2500HP Blowers in an Existing Building
  • New 60 inch Discharge Piping
  • Modifications to Aeration Piping System

Contract No. 1: General Construction, includes the addition of two (2) blowers with associated piping, valves, modifications to the existing SCADA system, electrical power and control system conduit, conductors and apputenances.