Highlights
- Completed: September 2012
- Two New 45,000LB, 2500HP Blowers in an Existing Building
- New 60 inch Discharge Piping
- Modifications to Aeration Piping System
Contract No. 1: General Construction, includes the addition of two (2) blowers with associated piping, valves, modifications to the existing SCADA system, electrical power and control system conduit, conductors and apputenances.