Skip to content
Contact Us

Preferred Language Is:

English Construction
Apply Now
Aplica Ya
Apply Now
  • About
    • Mission and Core Values
    • History
    • Services
    • Testimonials
  • News
    • Career Fairs
  • Careers
    • Current Openings
    • Benefits and Training
    • Apply Now
  • Safety
    • Trainings
  • Projects
    • View All
    • Buildings
    • Highways
    • Utilities
  • About
    • Mission and Core Values
    • History
    • Services
    • Testimonials
  • News
    • Career Fairs
  • Careers
    • Current Openings
    • Benefits and Training
    • Apply Now
  • Safety
    • Trainings
  • Projects
    • View All
    • Buildings
    • Highways
    • Utilities

Third Street Brewery – Farmville, VA – COMPLETED!

By englishconstSeptember 18, 2017

Tennant space upfit for a micro brewery and beer garden at the existing High Bridge Lofts (#1865) basement and annex space. Size is ~ 4,500 square feet. Owner: Third Street Brewing, LLC Architect: Ronsey CO. Architects Original Contract Value: $417,546 4500 SF

High Bridge Lofts – Longwood University – Farmville, VA

By englishconstSeptember 18, 2017

Selective Demolition and Stabilization of an existing brick masonry building built in 1902 on 3rd Street in Farmville VA. Re-pointing of existing masonry, new roof and insulation, select structural upgrades Owner: Walk2Campus Properties Architect: Rosney Co. Architects Original Contract Value: $1,013,641 38000 SF

Highland Pellets Plant – Pine Bluff, AR – COMPLETED!

By englishconstSeptember 18, 2017

English will manage the project which includes concrete for 4 pellet lines, woodyard 1 & 2 and loadout, includes pre-engineered buildings for the presses (32,500 sf), administration (2,500 sf) and maintenance (3,500 sf).  Also includes the installation of the conveyors and pellet equipment.

Kemper Street Bridge Replacement and Approaches - City of Lynchburg, VA - COMPLETED!

Kemper Street Bridge Replacement and Approaches – City of Lynchburg, VA – COMPLETED!

By englishconstOctober 25, 2016

This project consists of replacing existing Kemper Street bridge with 6,400 SF Bridge. Also included are extensive landscaping with rain guards, MSE walls, storm drainage and traffic control operations sequenced over several phases of construction. Highlights 6400 SF Bridge Sequenced Phased Construction Completion: August 2016 Client: City of Lynchburg

Press Box – Averett University – Danville, VA

By englishconstOctober 11, 2016

Approximately 10,000 SF press box with concessions and 1,200 bleacher seats. Includes concrete plaza and entrance fencing with gates. One NEW Building. Owner: Averett University Architect: Bowie Gridley Architects Original Contract Value: $3,044,203 10692 SF

NCDOT Contract C202962-I-73/I-74 – Richmond County, NC -COMPLETED!

By englishconstJanuary 4, 2016

Project consisting of approx. 3.7 miles of roadway improvements (upgrading section of US 220 to interstate standard) and new alignment. Some aspects of the project include 1.67 million CY of regular excavation, 3 two span bridges, 14,900 SF of temporary shoring, 42,700 LF of storm drain pipe, and a sound wall.

Birdsong Senior Apartments – Randolph Macon College – Ashland, VA – COMPLETED!

By englishconstDecember 7, 2015

The new 120 bed dormitory for Randolph Macon is 61,256 SF. The three stories are a combination of light gauge structure and structural steel with a brick veneer and synthetic slate roofing. The exterior is completed with clad windows, metal cornice, powder coated rails and fiberglass columns. The four bedroom units are complete with a…

VES King Garmey Fine Arts Center – City of Lynchburg, VA – COMPLETED!

VES King Garmey Fine Arts Center – City of Lynchburg, VA – COMPLETED!

By englishconstDecember 7, 2015

Renovation and addition to VES Gymnasium with two levels of structural steel and masonry. Converting gymnasium into 350 seat auditorium with reception areas on both levels. Highlights Completion Date: December 2015 Client: Virginia Episcopal School

VT Dairy Barn Relocation – Montgomery County, VA -COMPLETED!

VT Dairy Barn Relocation – Montgomery County, VA -COMPLETED!

By englishconstDecember 7, 2015

This project includes erosion control, rough grading, utilities, roadway, hardscape, prefabricated metal structures,process engineered systems, concrete foundations, electrical, mechanical, and plumbing. Thompson & Litton Highlights Design Build Completion: July 2, 2015 Client: Virginia Tech Foundation

St. Anne's Performing Arts Theater - Danville, VA - COMPLETED!

St. Anne’s Performing Arts Theater – Danville, VA – COMPLETED!

By englishconstDecember 7, 2015

The masonry bearing structure will seat 465 and have an 80’ wide stage with all of the required support spaces. Extensive excavation and shoring required to prepare the building pad. Highlights New 24,000 SF performing arts theater. Completion Date: 2015 Client: St. Anne’s Belfield School

←1
234567
…89101112…
13
14→
English Construction

Integrity, Relationships, Service, Quality, and Experience.

Phone:
434-845-0301

Fax:
434-845-0306

Address:

615 Church Street
Suite 2
Lynchburg, VA 24504

PO BOX P-7000
Lynchburg, VA 24505

Intranet

© 2025 English Construction Company. All rights reserved.

Go to Top

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in .

English Construction
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.