Whitethorn Water Treatment Plant - Gretna, VA - COMPLETED!

Whitethorn Water Treatment Plant – Gretna, VA

Date: 8/1/2024 This project consisted of the construction of a new wedge wire intake screen in Whitethorn Creek. The raw water pump station includes two vertical turbine pumps, approximately 250 feet of 10-inch raw water piping, an access road, a stream monitoring station, and related appurtenances. The purpose of this facility is to provide emergency…

NCDOT Contract C204419 NC-125 Roanoke Rapids

Date: 8/19/2024 This NCDOT project in Roanoke Rapids includes 1.5 miles of a new two lane road and the widening of an existing two lane road to four lanes for 1.5 miles.  This project’s value is approximately $24 million and will take approximately 2.5 years to complete.  It includes 215,000 CY of borrow material from…

Carvins Cove Water Treatment Facility Upgrade- Roanoke, VA

Project Name: Carvins Cove WTF – 2018 Filter Upgrade Project Owner: Western Virginia Water Authority Engineer: CHA Consulting, Inc. Project Duration: 270 Calendar Days Project Budget: $2,335,250.00 Project Description: The Project consists of the replacement of filter underdrain laterals, dual media, and wash water troughs; removal and disposal of the existing filter surface wash system,…

Town of Broadway WTP & System Improvements – Broadway, VA

Install new river intake structure, new raw water feed pumps and discharge piping, new rapid mix basin and two new flocculation basins with mixers, upgrade sedimentation basins with a Sludge Removal System, install of a Pall Membrane System housed in a new 30’x40’ precast concrete building, new MCC in membrane building, install new pre-cast concrete…