Town of Grottoes WWTP – Grottoes, VA – COMPLETED!
Highlights Install septage receiving building and equipment Install Lamella Clarifier Building & clarifier Completion Date: December 2014
Preferred Language Is:
Highlights Install septage receiving building and equipment Install Lamella Clarifier Building & clarifier Completion Date: December 2014
The Work to be completed under this Contract for the rehabilitation of Filter No.’s 3, 4, 6, 12, 14, 15 and 16 consists of the following: site preparation; dewater the filter; removal of the media from above the underdrain, in the plenums under the underdrain; removal and disposal of the M filter blocks; cleaning under…
Install 630LF Waterline with Appurtenances; demolish and remove existing regulator, construct new solids and floatable control regulator for CSO Outfall NO. 14, construct new entrance to site and restore site per Plans and Specifications Owner: City of Richmond Architect: Greeley and Hansen Original Contract Value: $3,631,000
The Reedy Fork Pump Station Project will provide two new wastewater pump stations to replace an existing station in the Kernersville, NC area. The new Reedy Fork Pump Station consists of a cast-in-place concrete triplex wet well for submersible pumps, electrical control building, generator, flow meter, valve vault, site piping, access driveway, waterline service, grading…
Highlights Construction of Tanglewood Pump Station, and an aeration system for existing water storage tank. Completion: April 2014
Highlights Nine story building Superstructure of concrete, structural steel and pre-fabricated structural metal framed wall panels Includes 618 dwelling units enough to accommodate over 1200 students Common space at the center of the building on each floor The extensive exterior improvements involved demolition of existing buildings, mass excavation, utility relocations, three exterior entrance structures, and…
Highlights Additions (3675 SF) and renovation (4625 SF) to Pritchett Hall. Concrete, steel structure with curtain wall glazing and brick veneer. Completion: January 2014
Highlights Includes new influent pumps, mechanical screens, grit collection equipment, effluent filters and belt press with improvements to existing oxidation ditch, secondary clarifiers and aerobic sludge digesters. Completion: July 2015
Highlights Rehab of existing pumping station to include replacement of yard valves, gallery piping, pumping units, electrical switchgear and power distribution system, installation of new standby generator, installation of new yard for Duke substation, installation of new pump control system. Completion: December 201
This project consists of the renovation of the existing 52000 SF school which includes site work with new parking lots and entrances; roof, windows, layout and finishes. The project will be phased to allow for partial occupancy.