VDOT Contract C00090347B60- Rt. 95 Lewistown Road – Ashland, VA
Grading, paving, storm drainage, utilities and structure at Lewistown Road and I-95 Interchange in Ashland, VA
Preferred Language Is:
Grading, paving, storm drainage, utilities and structure at Lewistown Road and I-95 Interchange in Ashland, VA
Install System Batched Reactors, solids handling equipment, retrofit post-EQ and pre – EQ basins, install new UV system, construct new admin building, demo existing structures, install yard pipe, and conduct associated site work.
This project consists of site preparation, dewater the filter, welding a lifting lug on plenum man way covers, removal of media from above the underdrain, removal and disposal of the M filter blocks, furnish and install Snap-T underdrain blocks and various other tasks. Highlights The rehabilitation of eleven effluent filters Completion Date: December 24, 2015…
Construction of a new 30 MGD pump station followed by demolition of the existing Steele Creek PS and demolition of the existing Westhall PS. Project also includes installation of approximately 38,500 lf of underground piping ranging in size from 8” to 60”. Rehabilitation of approximately 2,700 lf of 54” existing sewer and bypass pumping is…
75 Acre Graded Site Storm Drainage/Piping Water/Sanitary Sewer Piping Stormwater Management Facilities One Retention Pond Roadway and Parking Lot Construction Client: Red Sun Farms, LLC
Grading, paving, storm drainage, utilities, misc. concrete, underdrain, downspout lines, survey/layout, seeding. Site project for 4 story building within Mintbrook Development Highlights 4.52 Acres Repeat Client Completion July 2016 Client: Connelly Builders, Inc
3,430 SF Bridge and Approaches Over North Meherrin River Rte. 712 (Wallaces Bridge Road) Highlights Completion Date: April 2016
5,460 SF Bridge and Approaches Over Aaron’s Creek
Highlights Addition of 6900 SF to the Duval Dinning area and remodel the existing dining and kitchen. Add 1600 SF to the student center. Completion: December 2013
Highlights Remove existing turf field and provide sub base and drainage for a new synthetic turf field. New field lighting will also be provided. Completion Date: September 30, 2014